Opal Treeby – Age Care Center

Opal Treeby

Age Care Center

Scopes of works:

Garden Arbour build by Glen Esk.

Materials:

Vulcan FSC approved timber inlay to steel structure.

Opal-Tree-Before600px Opal-Tree-After600px

Scopes of works:

Garden Arbour build by Glen Esk.

Materials:

Vulcan FSC approved timber inlay to steel structure.

Matilda Bay Deck

Matilda Bay Deck

Scopes of works:

In conjunction with DBCA, Carey MC and their Community projects we were asked to Construct this Beautiful Jarrah/Aluminium Decking/platform.

Our Decking Specialist Charlie took the reigns for this project and really showed us his amazing Eye for detail and Knowledge of working with this stunning 140 x 40 thick Timbers, with the platform Referancing to the 1 nation people of the area.

We battled the rain and wind to get this done for the people of perth to enjoy over the summer.

Full installation of concrete, Aluminium and Fibreglass substructure finishing off with the Jarrah timbers from Morlock Timber.

Materials:

  • Timber Suppliers – Mortlock timber (# in IG)

Scopes of works:

In conjunction with DBCA, Carey MC and their Community projects we were asked to Construct this Beautiful Jarrah/Aluminium Decking/platform.

Our Decking Specialist Charlie took the reigns for this project and really showed us his amazing Eye for detail and Knowledge of working with this stunning 140 x 40 thick Timbers, with the platform Referancing to the 1 nation people of the area.

We battled the rain and wind to get this done for the people of perth to enjoy over the summer.

Full installation of concrete, Aluminium and Fibreglass substructure finishing off with the Jarrah timbers from Morlock Timber.

Materials:

  • Timber Suppliers – Mortlock timber (# in IG)

Optus Stadium Perth

Optus Stadium Perth

Scopes of works:

New Perth Stadium. Door and hardware installation.

Materials:

  • Need Copy

Scopes of works:

New Perth Stadium. Door and hardware installation.

Materials:

  • Need Copy

Next DC

Next DC

Data Centre – East Perth

Scopes of works:

7 levels of data hall space for cloud storage.

Contracted for the install of non-rated, Fire and Acoustic Rated doors and Architectural Hardware.

Installation of post fix door frames and grouting.

Materials:

  • Fire rated 4 and 2 hr single and Double door sets up to 3m high and 3m wide
  • Acoustic rated door sets
  • Commercial grade hardware, including: High Security SCEC hardware, Electric mortice locks, Auto flush bolts, Perimeter smoke seals, rebated RP38 auto Drop seals , Lockwood Closers, (Slide arm / scissor arm) Security magnetic locks, double door 2 point exit panic bar escape sets.

Scopes of works:

7 levels of data hall space for cloud storage.

Contracted for the install of non-rated, Fire and Acoustic Rated doors and Architectural Hardware.

Installation of post fix door frames and grouting

Materials:

  • Fire rated 4 and 2 hr single and Double door sets up to 3m high and 3m wide
  • Acoustic rated door sets
  • Commercial grade hardware, including: High Security SCEC hardware, Electric mortice locks, Auto flush bolts, Perimeter smoke seals, rebated RP38 auto Drop seals , Lockwood Closers, (Slide arm / scissor arm) Security magnetic locks, double door 2 point exit panic bar escape sets.

The Ritz Carlton Perth

The Ritz Carlton Perth

Scopes of works:

Install of sub frame and decking to the Day spa.

Materials:

  • Fibre glass decking boards
  • Secret clip system
  • CCA treated pine Sub structure.

Scopes of works:

Install of sub frame and decking to the Day spa.

Materials:

  • Fibre glass decking boards
  • Secret clip system
  • CCA treated pine Sub structure.